The Multi solution tool
ProDelta Multi-Solution Tool (MST) was developed with the optimizing costs in mind by completing multiple scopes of work in a single mobilization.
Based in Fort St. John, BC, ProDelta MST is one of the most efficient tools in the Asset Retirement Obligation (ARO) Process.
Through innovation, ProDelta’s self-supporting crew can complete the following in a single mobilization:
- Extended Reach (Background, Sumps, Flare Pits)
- Drill Up to 50 feet
- Access Repairs
- Well Centre Cut/Cap
- Decommissioning
- Snow Removal
- Solid Stem Auger
- Small Remediation
- Pile Removal
Safety features
In addition to the innovation focus on efficiency, ProDelta MST™ Is equipped with unique safety features not found in a common drilling solution:
- Articulation Mast for Clear Operator Visibility
- Auger Holder to Mitigate Tripping Hazards
- Remote Hydraulic Clamp for Auger Tripping
- Real-Time Telemetry for Auger Pull
Case study
Scope of Work For Two Sites Included:
• Decommission Well Facilities
• Above Ground Storage Tank
• Above Ground Piping/Building
• Well Centre Cut/Cap
• Stage Two (2) Drilling
• 12 boreholes/site
• Four (4) Days Allotted
results
ProDelta successfully completed the following:
• Project Completed Incident Free
• Executed project to 60% of the original budget,
• Site Now Ready for COR Part 1 Submission
9303 109 St
Fort St John, BC
V1J 6K6
CONNECT WITH US
© COPYRIGHT PRODELTA PROJECTS INC 2021. ALL RIGHTS RESERVED.
WEBSITE DESIGNED BY FLUID BUSINESS LAB INC
9303 109 St
Fort St John, BC
V1J 6K6
CONNECT WITH US
© COPYRIGHT PRODELTA PROJECTS INC 2021. ALL RIGHTS RESERVED.
WEBSITE DESIGNED BY FLUID BUSINESS LAB INC