PRODELTA MST

The all-in-one solution for major cost savings

Photo by: Kobe Tulloch, ProDelta Projects Inc.

different uses

foot max depth

more efficient

 The Multi solution tool

ProDelta Multi-Solution Tool (MST) was developed with the optimizing costs in mind by completing multiple scopes of work in a single mobilization.

Based in Fort St. John, BC, ProDelta MST is one of the most efficient tools in the Asset Retirement Obligation (ARO) Process.

Through innovation, ProDelta’s self-supporting crew can complete the following in a single mobilization:

  • Extended Reach (Background, Sumps, Flare Pits)
  • Drill Up to 50 feet
  • Access Repairs
  • Well Centre Cut/Cap
  • Decommissioning
  • Snow Removal
  • Solid Stem Auger
  • Small Remediation
  • Pile Removal

Safety features

In addition to the innovation focus on efficiency, ProDelta MST™ Is equipped with unique safety features not found in a common drilling solution:

  • Articulation Mast for Clear Operator Visibility
  • Auger Holder to Mitigate Tripping Hazards
  • Remote Hydraulic Clamp for Auger Tripping
  • Real-Time Telemetry for Auger Pull

Case study

Scope of Work For Two Sites Included:

• Decommission Well Facilities

• Above Ground Storage Tank

• Above Ground Piping/Building

• Well Centre Cut/Cap

• Stage Two (2) Drilling

• 12 boreholes/site

• Four (4) Days Allotted

results

ProDelta successfully completed the following:

• Project Completed Incident Free

Executed project to 60% of the original budget,

• Site Now Ready for COR Part 1 Submission

© COPYRIGHT PRODELTA PROJECTS INC 2021. ALL RIGHTS RESERVED.

WEBSITE DESIGNED BY FLUID BUSINESS  LAB INC

© COPYRIGHT PRODELTA PROJECTS INC 2021. ALL RIGHTS RESERVED.

WEBSITE DESIGNED BY FLUID BUSINESS  LAB INC